Bathroom and kitchen plumbing, planned properly
We plan the wet side of the room first — drainage falls, venting, valve positions — so tile and cabinetry land on a layout that actually works.
A remodel fails quietly at the rough-in stage: a drain with too little fall, a shower valve set too deep for the trim kit, a toilet waste that fights the joist. We survey and mark the wet wall before anything is ordered, so the finish trades are not working around plumbing guesses.
One plumber owns your project from survey to sign-off, and you get the same person on the final connection day.
What the visit includes
- Wet-wall survey and drainage fall calculation
- Rough-in for bath, shower, WC, basin and appliances
- Supply and waste relocation with permit paperwork
- Coordination schedule for tiler and cabinet fitter
- Pressure test and final connection with certificate
How the job is priced
You receive one flat figure covering the diagnosis, labour and the parts listed. Nothing is added without your approval, and the emergency rate is the same at night as it is during the day.
Common questions
Can you work with my own tiler?
Yes. We publish a rough-in sign-off date and hand the room over tested and capped.
Do you supply fixtures?
You choose them; we check specification and lead times before the rough-in is fixed.