Planning a bathroom remodel without the stress
The wet-wall decisions to make before ordering tile, and the order that keeps trades from blocking each other.
A bathroom is a small room with a lot of infrastructure. Sequence is the whole game: decide the wet wall, then the drainage, then the fixtures, then the finish.
Get that order right and the project feels calm. Reverse two steps and you pay twice.
Decide the wet wall first
Shower, basin and WC positions drive drainage falls and venting. Moving a drain after tiling is the most expensive change order in the room.
Confirm drainage before ordering
A 40mm waste needs a fall; a joist may be exactly where the fall wants to go. This is a survey decision, not a showroom decision.
Set valve depth with the trim in hand
Shower valves have a finished-wall depth range. Order the trim kit early so the rough-in is set to it, not to a guess.
Give access to the important bits
A concealed cistern, a filter and a thermostatic valve all need a service route. A removable panel is cheaper than a demolition.
Sequence the trades in writing
Rough-in, test, tile, fit, connect, sign off. Publish the dates; everyone works to the same plan.
The short version
- Freeze the layout before the first tile is ordered
- Pressure-test on the day of rough-in, not the day of handover
- Leave access panels wherever a serviceable part is hidden