Drainage

Basement drain replacement

A collapsed clay run under the basement slab replaced with a sleeved HDPE line and a new inspection chamber.

Basement drain replacement
Duration 6 days
Run replaced 7.4 m
Camera survey Included
Access added 1 chamber
The job

CCTV showed a dropped joint and root ingress 2.4m under the slab. We broke out a 900mm channel, replaced the run and added an access chamber so the next survey needs no demolition.

The slab was reinstated and the floor finish matched by the client's contractor.

Scope of works

  • Survey, photographs and written scope before the first day on site
  • Rough-in tested and signed off before finish trades arrive
  • Materials recorded on the invoice at the published margin
  • Handover pack including test results and guarantee

Project details

Location
Eastfield
Scope
Below-slab drainage
Completed
2024
Start a similar project
Plumber working at a bench in low light
Ready when you are

Need a plumber? We’re already on the way