Hillcrest kitchen re-pipe

A 1930s kitchen with galvanised supply lines replaced in five days, without removing the cabinets.

Hillcrest kitchen re-pipe
Duration 5 days
Pressure before 0.9 bar
Pressure after 3.1 bar
Cabinets replaced None
The job

The original galvanised run had narrowed to a pencil and the pressure at the tap was under one bar. Rather than strip the room, we routed new copper through the service void and connected under the units.

Work was sequenced around the family kitchen: water off between nine and four each day, always back on for the evening.

Scope of works

  • Survey, photographs and written scope before the first day on site
  • Rough-in tested and signed off before finish trades arrive
  • Materials recorded on the invoice at the published margin
  • Handover pack including test results and guarantee

Project details

Location
Hillcrest
Scope
Full supply re-pipe
Completed
2025