Bathroom

Rowhouse bathroom rebuild

A 3.2m bathroom re-planned around a walk-in shower, with the drainage re-routed through a bulkhead.

Rowhouse bathroom rebuild
Duration 11 days
Drain fall 1:60
Trades coordinated 3
Re-visits 0
The job

The room had a shower over the bath and a waste that ran uphill. We dropped the floor zone by 60mm in a bulkhead and gave the shower a proper fall.

The client kept the existing tile palette; only the wet wall changed.

Scope of works

  • Survey, photographs and written scope before the first day on site
  • Rough-in tested and signed off before finish trades arrive
  • Materials recorded on the invoice at the published margin
  • Handover pack including test results and guarantee

Project details

Location
Northgate
Scope
Rough-in and fit
Completed
2025