Rowhouse bathroom rebuild
A 3.2m bathroom re-planned around a walk-in shower, with the drainage re-routed through a bulkhead.
The job
The room had a shower over the bath and a waste that ran uphill. We dropped the floor zone by 60mm in a bulkhead and gave the shower a proper fall.
The client kept the existing tile palette; only the wet wall changed.
Scope of works
- Survey, photographs and written scope before the first day on site
- Rough-in tested and signed off before finish trades arrive
- Materials recorded on the invoice at the published margin
- Handover pack including test results and guarantee