Hot water
Tankless retrofit
Two bathrooms and a laundry moved from a failing 190L tank to a condensing tankless unit with a recirculation loop.
The job
Peak draw was the problem: two showers at once emptied the tank by 7:20am. A condensing tankless unit with a small recirculation loop removed the wait for hot water at the far bathroom.
Venting was run through an existing flue route, so no new penetration was needed.
Scope of works
- Survey, photographs and written scope before the first day on site
- Rough-in tested and signed off before finish trades arrive
- Materials recorded on the invoice at the published margin
- Handover pack including test results and guarantee
Project details
Location
Marlow Heights
Scope
Hot water upgrade
Completed
2024