Hot water

Tankless retrofit

Two bathrooms and a laundry moved from a failing 190L tank to a condensing tankless unit with a recirculation loop.

Tankless retrofit
Duration 2 days
Hot water wait 22s → 3s
Footprint 0.4 m² freed
Venting Reused flue
The job

Peak draw was the problem: two showers at once emptied the tank by 7:20am. A condensing tankless unit with a small recirculation loop removed the wait for hot water at the far bathroom.

Venting was run through an existing flue route, so no new penetration was needed.

Scope of works

  • Survey, photographs and written scope before the first day on site
  • Rough-in tested and signed off before finish trades arrive
  • Materials recorded on the invoice at the published margin
  • Handover pack including test results and guarantee

Project details

Location
Marlow Heights
Scope
Hot water upgrade
Completed
2024